Improving reliability and capacity of the electric transmission system in Washington state

File SB5466 ("Improving reliability and capacity of the electric transmission system in Washington state") is before the Washington Legislature and has not been decided. Latest step (February 9, 2026): Substitute bill (3SSB 5466) by Senate Ways & Means, read first time.

Washington file SB5466, before the Washington Legislature. Still to be decided as of 2026-02-09.

How they voted

Yes (58)

No (39)

Did not vote / other (1)

Read the official record for SB5466

See everything up for a vote · This week in Washington · See what we have filed with the clerk