Congress file hr3898-119, before Congress. Still to be decided as of 2025-12-11.
Wetlands and seasonal streams lose federal protection Ephemeral streams (those flowing only after rain), groundwater, and certain converted cropland are removed from Clean Water Act jurisdiction, meaning landowners can discharge pollutants into these features without federal permits starting upon enactment.
Energy infrastructure permitting speeds up significantly Streamlined water quality certification for pipelines, power plants, and other energy projects reduces federal review scope and timelines, likely accelerating permit approvals across multiple industries dependent on water discharge or crossing.
Downstream water quality and flood resilience risks Environmental groups warn that excluding ephemeral streams and groundwater from protection could degrade drinking water sources, increase flooding vulnerability in communities relying on seasonal water storage, and limit states' ability to enforce stricter pollution standards.
Promoting Efficient Review for Modern Infrastructure Today Act or the PERMIT ActThis bill limits the scope of the Clean Water Act by redefining navigable waters to exclude (1) waste treatment systems, (2) ephemeral features that flow only in direct response to precipitation, (3) prior converted cropland, (4) groundwater, or (5) any other features determined to be excluded by the U.S. Army Corps of Engineers.
Read the official record for hr3898-119
See everything up for a vote · This week in Congress · See what we have filed with the clerk