Allows stormwater work on port authority land

Saint Paul file RES 26-980, before the Saint Paul City Council. Did not pass as of 2026-06-16.

Latest action: Archived

What it does

Construction can proceed on stormwater systems The city grants temporary permission for The Heights project to build and maintain stormwater best management practices (filters and drainage systems that reduce runoff) on Port Authority land.

The bigger picture

Reduces flooding risk in the surrounding area Better stormwater management at The Heights means less flooding and fewer pollutants flowing into local streets and water systems during heavy rain.

What to watch

Easement is temporary and maintenance falls to developer The agreement is time-limited and requires the project developer to maintain the stormwater systems; if they abandon the site or maintenance lapses, the city may need to take over or residents face drainage problems.

Read the official record for RES 26-980