File RES 26-1884 ("Downtown tunnel inspection and repair work proposed") did not pass the Saint Paul City Council, by a recorded vote of 3 to 0. Last action: November 10, 2026.
Saint Paul file RES 26-1884, before the Saint Paul City Council. Did not pass as of 2026-11-10.
Downtown tunnel work moves forward with contractor Saint Paul will pay TKDA to inspect the downtown tunnels, design fixes, and oversee construction work during 2026.
Tunnel repairs may affect downtown traffic and access Construction in downtown tunnels during 2026 could cause temporary closures or slowdowns in the area above ground.
Read the official record for RES 26-1884
See everything up for a vote · This week in Saint Paul · See what we have filed with the clerk