Nashville approved file BL2026-1375 ("Nashville accepts new water and sewer infrastructure at Kings Lane"). Last action: June 2, 2026.
Nashville file BL2026-1375, before Nashville. Passed as of 2026-06-02.
Water and sewer service extended to Kings Lane development Residents and businesses at 401C Friendship Drive gain reliable public water and sanitary sewer service once the project is occupied, replacing any interim private systems.
City absorbs maintenance costs for new public utility assets Nashville assumes long-term repair, replacement, and operational responsibility for the water mains, sewer lines, and fire hydrants, funded through water and sewer utility rates.
Developer standards must meet city specifications before handoff If the installed mains, hydrants, or easements fail to meet Nashville's construction or engineering standards, the city may require costly repairs or corrections before acceptance.