Minneapolis file 2026-01081, before the Minneapolis City Council. Passed as of 2026-10-10.
Latest action: Published
Street work will affect 1st Ave South traffic. Construction on the 1st Ave S Reconstruction Project will remove an old tunnel opening (an areaway) between 1800 1st Ave S and 110 18th St E, likely causing temporary traffic changes and lane closures in that area.
Safer street design removes hazard for drivers. Filling in the unused tunnel opening improves street safety by removing a potential hazard and allows the city to rebuild 1st Avenue with modern standards as part of the larger reconstruction project.
Project cost and timeline not yet set. The city is still estimating the total cost and scheduling the public hearing; residents won't know the full price tag or construction timeline until after the hearing moves forward.
Passage of Resolution designating thelocation of the former Allina pedestrian tunnel for areaway removal between 1800 1st Ave S and 110 18th St E as part of the 1st Ave S Reconstruction Project No 2347(CPV160)
Read the official record for 2026-01081