Logan Park green stormwater project

The Minneapolis City Council approved file 2026-00708 ("Logan Park green stormwater project"), by a recorded vote of 12 to 0. Last action: June 27, 2026.

Minneapolis file 2026-00708, before the Minneapolis City Council. Passed as of 2026-06-27.

What it does

Reduces flooding risk in Logan Park Industrial area Green stormwater systems capture and filter rainwater on-site instead of overwhelming storm drains, lowering flood risk for nearby homes and businesses during heavy rain.

The bigger picture

Improves air quality and green space in industrial zone New plantings absorb air pollution, reduce heat, and create habitat, making the industrial area healthier for workers and nearby residents over time.

What to watch

Benefits limited to Logan Park Industrial Phase 1 area This is the first phase of a larger project, so flooding and green-space improvements apply only to this section; other nearby neighborhoods with similar stormwater problems wait for future phases.

Official summary

Accepting the low bid of New Look Contracting, Inc. submitted on Event 4121, in the amount of $1,478,503.50, to provide all materials, labor, equipment and incidentals necessary for the Logan Park Industrial Phase 1 Green Stormwater Infrastructure (GSI) and Landscape Plantings project, and authorizing a contract for the project, all in accordance with City specifications.

How they voted

Yes (12)

Did not vote / other (1)

Read the official record for 2026-00708

See everything up for a vote · This week in Minneapolis · See what we have filed with the clerk