Green stormwater inspection contract through 2026

The Minneapolis City Council approved file 2026-00121 ("Green stormwater inspection contract through 2026"), by a recorded vote of 13 to 0. Last action: February 28, 2026.

Minneapolis file 2026-00121, before the Minneapolis City Council. Passed as of 2026-02-28.

What it does

City inspects green stormwater systems to catch problems early Public Works will inspect green stormwater systems (rainwater gardens and filters that clean runoff) for $110,000 per year through the end of 2026, finding damage or clogs before they cause flooding.

The bigger picture

Regular inspections help green spaces work longer and cost less Catching stormwater system problems early prevents expensive repairs later and keeps rain gardens healthy, reducing the need for bigger fixes to roads and drainage pipes across the city.

What to watch

Contract covers only inspections, not repairs or maintenance The city pays for finding problems, not fixing them; funding for actual repairs or upkeep of the green systems is not included in this contract.

Official summary

Accepting the second low bid of Metro Blooms Design and Build LLC, submitted on Event 3717,to provide all materials, labor, equipment, and incidentals necessary forGreen Stormwater Infrastructure Inspection for Public Works,and authorizing a contract for an estimated annualamount of$110,000through December 31, 2026, with the option to extend for two (2) additional 12-month terms, all in accordance with City specifications.