Construction: permits; acoustic engineering report for data center; require to receive building permit.

File HB6139 ("Construction: permits; acoustic engineering report for data center; require to receive building permit.") is before the Michigan Legislature and has not been decided. Latest step (June 30, 2026): bill electronically reproduced 06/25/2026.

Michigan file HB6139, before the Michigan Legislature. Still to be decided as of 2026-06-30.

Read the official record for HB6139

See everything up for a vote · This week in Michigan · See what we have filed with the clerk