File 25-0712 ("Vincent Thomas Bridge seismic retrofit and closure plan") is before Losangeles and has not been decided.
Losangeles file 25-0712, before Losangeles. Still to be decided.
Drivers will need to use detour routes during bridge closure When the Vincent Thomas Bridge closes for seismic work, drivers between Long Beach and San Pedro will need to use alternate routes; the city is identifying and setting up those detour roads now.
New safety cameras will monitor the bridge after retrofit The city is planning camera locations to monitor the bridge during and after the seismic retrofit work to check safety and catch problems early.
Read the official record for 25-0712
See everything up for a vote · This week in Losangeles · See what we have filed with the clerk