Columbus approved file 2854-2026 ("To authorize the Director of Columbus Water and Power to modify a contract for the 2026 Utility Cut Restoration Project with Decker Construction Company for the Division of Water; and to authorize the expenditure of $650,000.00 through March 31, 2027. ($650,000.00)"), by a recorded vote of 9 to 0. Last action: November 18, 2026.
Columbus file 2854-2026, before Columbus. Passed as of 2026-11-18.