Lets factories combine renewable power across sites

The California Legislature approved file 202520260AB2175 ("Lets factories combine renewable power across sites"), by a recorded vote of 108 to 0. Last action: July 16, 2026.

California file 202520260AB2175, before the California Legislature. Passed as of 2026-07-16.

What it does

Factories can combine solar across multiple sites Logistics and manufacturing businesses with multiple meters can now aggregate renewable energy generation across separate buildings or properties into a single virtual pool, allowing them to offset electricity costs more efficiently without duplicating renewable infrastructure.

The bigger picture

Removes barriers to distributed solar adoption By simplifying metering rules for multi-site operators, the bill reduces technical and regulatory friction that previously discouraged smaller distributed renewable installations, potentially accelerating grid decarbonization and reducing grid strain during peak demand.

How they voted

Yes (108)

Read the official record for 202520260AB2175

See everything up for a vote · This week in California · See what we have filed with the clerk