Speeds up school building projects with design-build

The California Legislature approved file 202520260AB1860 ("Speeds up school building projects with design-build"), by a recorded vote of 111 to 5. Last action: September 30, 2026.

California file 202520260AB1860, before the California Legislature. Passed as of 2026-09-30.

What it does

School facilities may be built faster and potentially cheaper Counties using design-build can compress construction timelines by combining design and construction phases, though actual savings depend on project scope and market conditions.

The bigger picture

Construction industry sees consolidated bidding and workforce implications Design-build favors larger, integrated construction firms capable of handling design and construction, which may reduce competition from smaller specialty contractors and affect labor negotiations.

What to watch

Less competitive bidding and reduced design-phase public input Design-build reduces the number of separate competitive bids and may limit public visibility and input during design phases compared to traditional methods where design is finalized before construction contracts are awarded.

How they voted

Yes (111)

No (5)

Read the official record for 202520260AB1860

See everything up for a vote · This week in California · See what we have filed with the clerk